Sign In | Join Free | My himfr.com
Home > Power Supply Test System >

Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

Dongguan Chuangrui New Energy Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data from wholesalers
     
    Buy cheap Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data from wholesalers
    • Buy cheap Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data from wholesalers

    Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

    Ask Lasest Price
    Brand Name : Topfer
    Model Number : Top-Smart 1100
    Price : to be discussed
    Payment Terms : T/T
    Supply Ability : 10 sets /30 days
    Delivery Time : 2 to 3 weeks
    • Product Details
    • Company Profile

    Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

    The multi-functional power supply testing system, driving power supply testing equipment, and power tester can save test data


    Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:

    • Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.

    • High extensibility, easily integrating standardized interface testers.

    • Fast testing speed, 3-4 times faster than traditional ATS systems.

    • Open system platform, allowing for self-edited test steps according to requirements.

    • Standardized instrument control interface and graphical operating environment (Windows interface).

    • The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.


    1. Acceptance: Conduct a comprehensive inspection and test of the functions and quality of the high-speed power supply testing system equipment to ensure they are consistent with the contract description. Fill out the project acceptance form and file it in the project archive. Promptly address any issues raised by the customer during the acceptance process. The acceptance is considered qualified only when qualified products are detected and the maximum benefits of the high-speed power supply testing system equipment are maximized.


    2. Training: Provide training for the operators and maintenance personnel of the customer's high-speed power supply testing system. The customer's operators can participate in the debugging work of the high-speed power supply testing system. After it is used on-site at the customer's factory, another training will be conducted until the staff can operate and maintain the system normally.


    3. Transportation, Installation and Commissioning: Chuangrui will transport the high-speed power supply testing system equipment to the customer's factory for free installation and commissioning. The customer's factory is responsible for assisting in positioning the equipment and providing the power sockets required for the equipment. Chuangrui will be responsible for the installation and commissioning work.


    4. Warranty: The high-speed power supply testing system equipment is guaranteed for one year after the customer's commissioning and production. During the warranty period, Chuangrui shall be responsible for the free repair of equipment failures in the high-speed power supply test system. If the system components are damaged due to the design, manufacture or installation of Chuangrui, Chuangrui shall replace the system components free of charge. Accessories will be provided at the most favorable price outside the warranty period.


    Test Items for the Switching Power Supply Testing System :

    Test itemsTest items
    Measuring under LED.ModeTracking
    DC Current under C.V.ModeShort circuit test
    Peak-Peak noiseShort circuit current
    Current peak-Peak noiseOV protection
    Voltage peak-Peak noiseUV protection
    Transient response timeOL protection
    Transient spikeOP protection
    Voltage regulationIn-test adjustment
    Current regulationAC cycle drop out
    Turn ON timePLD simulation
    Rise timeGPIB read/write
    Fall time232 read/write
    Hold-up timeUSB read/write
    Inrush current testTTL signal control
    Power good signalRelay control
    Power fail signalBar code scan
    P/S ON signalDynamic test
    Power up sequenceSpecification under C.P.Mode
    Power off sequenceDC output current
    EffciencyDC output voltage
    Input RMS currentCurrent Ripple test
    Input powerDimming Current
    Input power factorDimming frequency
    Input voltage rampDimming period
    Input freq. ramp

    Quality Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Dongguan Chuangrui New Energy Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)